BRIDGES & FLYOVERS
capline
flyover2

Structural Design for Corridor II of Hyderabad Metro
(from Jubilee Bus Stand (JBS) to Falaknuma), Hyderabad, India

Salient Features:

M/s Pragati Consultants associated L&T Ramboll Consulting Engineers Limited in the detailed design services of the Viaduct for Corridor II.


The Scope of the Project is as given below:

  Mr. Anjaneyulu was appointed as the Team Leader- L&T Ramboll.

  M/s Pragati Consultants deputed senior bridge engineer & senior draughtsmen for carrying out detailed designs of typical Superstructure and substructures.

  Team Leader led a team consisting of L&T Ramboll & Pragati Consultants to carry out entire scope of work to be performed by L&T Ramboll under agreement with HMRL.

flyover2

Elevated Bangalore - Hosur Expressway on
NH- (Between Silk Board Junction to Electronic city), Bangalore, India

Salient Features:

This is a BOT project for a consortium of contractors comprising of M/s.Nagarjuna Constructions, Mytas Infra and SOMA enterprises.

The Cost of the project is around 450 Crores.

The Scope of the Project is as given below:

  Construction of RCC Drain on both side of the carriageway

  Widening of the existing main carriageway from 4 Lane to 6 Lane     standards.

  Widening of Service road to 2 Lane with 2.5 m shoulder.

  Construction of approach Ramp with Reinforced earth wall of width    16.4 m from Km 9.509 to Km 9.681

  Construction of 4 Lane Elevated Corridor with Precast Segmental     construction from Km 9.681 to Km 17.735 (8.045 Km)

  Construction of Interchange at Electronic City consisting of RCC     curved voided slabs and Precast girders with in-situ deck slab.

  Widening of existing cross drainage structures.

  Construction of Pedestrian subways at four locations with Box pushing      method..
Salient Features:

Owner: Greater Hyderabad Municipal Corporation, India. .

Construction Agency:  JMC Projects (India) Pvt Ltd  .

Construction Cost : Rs. 19 Crores.

The total length of the flyover is around 870 m length including 1 Nos. of Obligatory span sigle cell cast insitu curved PSC box girder of span 40.0m Viaduct spans consists of 3/4 span continuous precast PSC girders with insitu deck slab..

Salient Features:

Entrepreneur: Maharashtra State Road Development Corp.

Construction Agency:  Nagarjuna Construction Company Limited - ECCI Limited Joint Venture, Hyderabad, India.

Construction Cost : Rs. 42Crores.

This is a six-lane flyover of length 1427.00 meters and width 24.20 meters. The length of the viaduct portion of the flyover is 1127.00 meters comprising of 400 numbers of post-tensioned I-girders and having 50 spans (ten five-span continuous segments) of 20 meters each and two two-span cast-in-situ prestressed concrete continuous box girders spanning 44.00 - 27.00 meters at Kalina and Vakola junctions.

We submitted the designs and drawings in a phased manner enabling the contractor to complete the project three months ahead of schedule.

Salient Features:

Entrepreneur: Maharashtra State Road Development Corp.

Construction Agency:  Nagarjuna Construction Company Limited - ECCI Limited Joint Venture, Hyderabad, India.

Construction Cost : Rs. 18Crores.

The flyover is of 460 m length including 1 Nos. of Obligatory span twin cell cast insitu curved PSC box girder of span 37.0m Viaduct spans consists of 3 span continuous twin cell PSC box girder catering to 3 lane carriageway of 11.0 m width.

The substructure consists of single pier with a cantilever pier cap and open foundations.

This project also consists of a 100 m length closed subway with 200 m open subway on either side in effect giving rise to a three level interchange at the junction..

Salient Features:

This is a BOT project for M/s. M .V.R. Infrastructure and Tollways Pvt. Ltd.

The construction package for the project includes developing the existing two lane carriageway to four I six lane divided carriageway standards.

The entire stretch of the projects include 4 Nos. Flyovers, 1 Nos.. Road over bridge, 14 Nos. Minor bridges, 48 Nos. CD structures and 8 Nos. Pedestrian underpass.

Salient Features:

This is a project for M/s. Lanco Infratech. Ltd.

Design of High level bridge across river Narmada as part of MP state road sector development project , Phase II between Chabi to Shapura road. This 2 Lane bridge consists of 8 spans of 30 m resting on hammer head piers and box type abutment. The cost of the bridge 100 crores.

Please click on the link below to see a comprehensive list of all the other bridge / flyover
projects completed by PRAGATI CONSULTANTS

LIST OF BRIDGE PROJECTS